Construction Debris/ Trash Container:

We will deliver the container for your project. The price you will be quoted will include, delivery, pick up and disposal up to the designated weight for the container.

  • 15 yard 3 ton
  • 20 yard 4 ton
  • 30 yard 5 ton.

These weights will accommodate normal construction and household debris. Any amount of brick, block, concrete or dirt may cause the container to go over the weights and additional charges will apply.

If there is a need to dispose of these heavier materials, we set 20-yard containers for a bulk price.

Area needed for containers - Size of containers

  • 15 yard 8’Wx16’Lx4’H
  • 20 yard 8’Wx22’Lx4’H
  • 30 yard 8’Wx22’Lx6’H
  • 40 yard 8’Wx22’Lx8’H

When picking an area to place your dumpster please keep in mind that the containers "Roll Off the back of the trucks. The area needed to deliver the container is approximately 80' (the truck is 37' long, container 22' long and room to maneuver).

The container itself is about 1½ car lengths. The total area needed will be about 5 car lengths. You also need to be aware of overhead obstructions such as power lines and tree branches.

Amount container holds:

  • 15 cubic yard about 3 to 4 pick up loads
  • 20 cubic yard about 5 to 6
  • 30 cubic yard about 7 to 8
 

   

© 2009 M.A.S. Company, Inc.
All rights reserved.

ABOUT US | PHOTO GALLERY | ROLL-OFF CONTAINERS | SCRAP TIRES | TESTIMONIALS | EMPLOYMENT

 

Created by Cogar Printing - 410-391-8888
1515 Martin Blvd., Baltimore, MD 21220
sales@cogarprinting.com